free migration · one command

Leave your provider. Keep your server.

Paste one command on the server you are leaving and Evorxa copies the whole disk, block by block, onto new metal here. It arrives running the same operating system with the same files, users and settings, and you sign in exactly as you did before.

ConnectPrepareCopyFinish

how it works

One command on your old server

No export, no snapshot upload, no reinstall. Order a plan, choose Migrate a server, and the console hands you a single line for the box you are leaving. It measures the disk, then copies it across on its own; you can close the page while it runs.

  1. Connect

    The agent enrolls with its single-use token and measures the disk it is about to move.

  2. Prepare

    We confirm the disk fits your plan, then build the destination. If it cannot fit, nothing is built and nothing is charged.

  3. Copy

    The whole disk streams across block by block while your old server keeps serving. A dropped connection resumes where it left off.

  4. Finish

    Your clone boots on new metal and we email you the address. Sign in exactly as you did before.

Byte for byte

The copy happens below the filesystem, so nothing is selected and nothing is left behind. Packages, databases, dotfiles, cron jobs and half-finished configs arrive exactly where they were.

Your old server is never touched

The source disk is opened read only, and the agent removes itself once the copy is staged. The server you are leaving keeps running through the whole move and stays yours afterwards.

No migration fee

You pay for the plan you were buying anyway. The destination is only built and charged after your old server connects and the disk is confirmed to fit.

what comes across

Everything, because nothing is selected

A file sync moves what someone remembered to include. A block-level copy moves the machine.

It arrives as it was

The same operating system it ran this morning, the same users and passwords, the same services in the same state. Keep the old server for a week and point your domains here when you are ready; until then the two run side by side.

Linux

One line with curl, as root. The copy is allocation aware, so empty space costs no transfer time.

Windows

One line in PowerShell, as Administrator. The copy reads from a shadow snapshot for consistency, and the clone gets the storage drivers it needs to boot here.

From any provider

If you can open a shell on it, we can move it. There is nothing to install ahead of time and no integration to wait for; the same command works from any host, any panel, any country.

Where it lands

A migration lands on a normal plan. The copy is byte for byte, so pick one with at least as much storage as the disk you are leaving, even if most of it is empty.

Clear plans. Choose what you need.

Compare resources and choose a plan for your game server, business apps or next project. Switch billing cycles to see prepaid discounts.

Every tier: NVMe storage · Shield protection · AI agent access, with usage billed separately

Standard VMs

General-purpose VMs with unmetered bandwidth.

Cores
4–10
shared cores
Storage
100–400 GB
NVMe
Uplink
Up to 2 Gbps
  • Tinyvm.tiny.8gb
    $11.99/mo
    Cores
    4
    Memory
    8 GB
    Storage
    100 GB
    Uplink
    1 Gbps
    Provision →
  • Largevm.large.10gb
    $14.99/mo
    Cores
    4
    Memory
    10 GB
    Storage
    150 GB
    Uplink
    1 Gbps
    Provision →
  • XLargevm.xlarge.16gb
    $22.99/mo
    Cores
    6
    Memory
    16 GB
    Storage
    200 GB
    Uplink
    2 Gbps
    Provision →
  • 2XLarge3 leftvm.2xlarge.20gb
    $29.99/mo
    Cores
    8
    Memory
    20 GB
    Storage
    300 GB
    Uplink
    2 Gbps
    Provision →
  • 3XLarge3 leftvm.3xlarge.32gb
    $44.99/mo
    Cores
    10
    Memory
    32 GB
    Storage
    400 GB
    Uplink
    2 Gbps
    Provision →

Prices in USD · prepaid for the selected billing cycle

Questions

Before you move a server

Does my old server go offline during the copy?

No. The disk is read in place while the server keeps running, and the copy streams across in the background. Your old server stays with your old provider, untouched, and the two run side by side until you switch your domains over.

What does a migration cost?

Nothing beyond the plan itself. There is no migration fee, and your new server is only built and charged after your old one connects and the disk is confirmed to fit.

What actually comes across?

The whole disk, block by block. The operating system, files, users, passwords, services and settings arrive exactly as they were, and you sign in the way you always did.

Is Windows supported?

Yes, end to end. You paste one line into PowerShell as Administrator, the copy reads from a shadow snapshot so it stays consistent, and the clone is fixed up to boot on our hardware before it starts.

What size plan do I need?

One with at least as much disk as the server you are leaving. The copy is byte for byte, so the new disk cannot be smaller than the old one even if most of it is empty. Up to three disks come across.

What if the connection drops halfway?

The copy pauses and resumes where it left off as soon as your old server can reach us again. Nothing is lost. And if you change your mind, you can reinstall a fresh OS on the new machine at no extra charge.

Moving day, without the moving

Order a plan, paste one line on the old box, and watch the copy run in the console. Your old server never notices. Your new one boots as if nothing happened.

One command on the old serverThe whole disk, block by blockLinux and Windows, end to endThe source is read only, then left aloneNo migration fee on any plan